Application Form for Basic Design of CHP & CCHP Solution


This form will be used to create the basic data for new power plant. so, please fill out the green blank by write directly or select the Number. [ Date : 2024.10.10 ]

1.PROJECT NAME 

2.CLIENT
* 1) Name of Client
2) Site Location
* 3) Country
* 4) Email
* 5) Phone Number
6) Purpose of Plant   1.To connect to utility  2.For factory load  3.Others to be specified
Specify the No.3 above : 
7) Power Plant Construction   1. New       2. Extension

3.SYSTEM
*1) Total Capacity of Power Plant   MW
2) Number of Generator sets   Set(s)
*3) Generation Voltage   kV
4) Plant Evacuation Voltage   kV
5) Auxiliary Power Voltage   V
6) Generator Power Factor  1. 0.8         2. 0.85       3. 0.9     4. Others(    )
*7) Frequency  1. 50Hz      2. 60Hz
*8) Aux. Power Supply  1. From This Power Plant     2. From National Grid 
9) Typical mode of generation  1. Continuous base load   2. Emergency  3. Others to be specified (    )

4.SITE CONDITION       REMARK  
 1)Ambient Air temperature         Max.   Degree C
Design   Degree C   
Min.   Degree C   
2)   Altitude     m  AMSL    
3)   Barometric Pressure     mBar   
4)   Relative Humidity     %

5.OPERATION
1)   Operation Time   hr/Day        Day/Year
2)   Operation Mode   1. Solo Operation  2. Parallel operation with other Gen-sets.   
3. Parallel operation with Grid  

*6.KIND OF FUEL   1. Biogas 2. LNG 3. Natural Gas

7.SPECIFICATION OF FUEL   
   GAS REMARK
1) Gas pressure bar.g    
2) Density kg/Nm3    
3) LCV Kcal/Nm3   
4) Contents of Gas       
   contents % (Volume) % (Mass) contents % (Volume) % (Mass)
   N2(Nitrogen)   C2H6(Ethane)
   CO2(Carbon dioxide)   C3H6(Propylene )
   O2(Oxygen)   C3H8(Propane)
   H2S(Hydrogen sulfide)   C4H10(Butane)
   CO(Carbon monoxide)   C5H12(Pentane)
   H2(Hydrogen)   C6H14(Hexane)
   CH4(Methane)   S(Sulfur)
   C2H4(Ethylene)   NH3(Ammonia)

8.REQUIRED COOLING SYSTEM 
*1)   Type   1. Radiator       2. Cooling Tower     3. Central Cooler 
2)   Cooling Water Source   1. City water    2. Borewell water     3. Sea water    4. River water   

9.POWER SOURCE
1) Auxiliary Power Voltage       REMARK
   AC (3PH)   V    
   AC (1PH)   V    

10.LOCAL ENVIRONMENTAL REQUIREMENT   
1) Emission REMARK
   NOx mg/Nm3   /   ppm at 15% O₂Dry (Select One Unit only)
   SOx mg/Nm3   /   ppm at 15% O₂Dry (Select One Unit only)
   PM mg/Nm3   /   ppm at 15% O₂Dry (Select One Unit only)
2) Discharge Water Quality ppm (oil contents)
3) Noise dB(A) & Required measuring location

11.SCOPE OF WORK
1)     1. Turn-key   2. Equipment Supply(If you select this number, select items the below)
2)   1. Mechanical   2. Electrical    3. Instrumentation   4. Civil works   5. Power House   6. Tank Farm
  7. WTS            8. OWS         9. HVAC
  Note : WTS - Water Treatment System,  OWS - Oily Water System,  HVAC - Heating, Ventilation & Air Conditioner
3)   Erection   
  1. Included            2. Not Included
4)   Supervision   
  1. Erection           2. Site test & Commissioning      3. Civil & Power House
5)   Engineering   
  1. Engineering for HONNY POWER's Supply Only      2. Plant Detail Engineering (Total)

12.MECHANICAL SYSTEM APPLICATION
1)   Steam Supply   
1. Exhaust Gas Boiler    2. Oil Fired Boiler     3. Steam Supply by Client (      kg/hr,      bar,      ℃)
2)   Hot Water Supply (Please inform us your Heat Recovery System)      
1. Exhaust Gas Boiler    2. Oil Fired Boiler     3. Steam Supply by Client (      kg/hr,      bar,      ℃) 
Feed Water Flow Rate   m3/hr   
Boiler Inlet Temperature   ℃   
Boiler Outlet Temperature   ℃   

13.ELECTRICAL SYSTEM APPLICATION
1)   Step-up Transformer   1. Unit TR         2. Common TR       3. Not Required
2)   Auxiliary Transformer   1. Supply by HONNY POWER          2. Supply by Others 
3)   Switchgear Type   1. VCB                        2. GCB
4)     Outgoing Feeder Circuit Breaker Panel   
1. Supply by HONNY POWER (Required Feeder No(s) :    No(s)      2. Supply by Others
5)   Common Synchro Panel   1. Supply by HONNY POWER     2. Supply by Others 
6)   Auxiliary Transformer Feeder Circuit Breaker Panel       
1. Supply by HONNY POWER (Required Feeder No(s) :    No(s)      2. Supply by Others 
7)   Generator Circuit Breaker Panel   1. Supply by HONNY POWER          2. Supply by Others 
8)   LV Incoming ACB Panel   1. Supply by HONNY POWER          2. Supply by Others 
9)   Motor Control Center   1. Supply by HONNY POWER          2. Supply by Others 
10)   LV Power Distribution Panel (Lighting Panel, Small Power Dist. Panel, etc.)    
1. Supply by HONNY POWER    2. Supply by Others
11)   DC System (Battery & Charger)   1. Supply by HONNY POWER          2. Supply by Others 
12)   UPS   1. Supply by HONNY POWER          2. Supply by Others 
13)   Black Start D/G Set   1. Supply by HONNY POWER          2. Supply by Others 

14.INSTRUMENTATION & CONTROL SYSTEM APPLICATION         
1)   Plant Control & Monitoring System        
1. Supply by HONNY POWER                          2. Supply by Others   
2)   ENG. & GEN. Control Panel 1. Supply by HONNY POWER          2. Supply by Others 

15 . OTHER REQUIREMENT
01
02   For Client (To be required by Client)

QQ客服

QQ客服

在线客服

咨询电话